Submersible Pump Blog

Published on
Image description
Start deep well submersible pump, should be smooth rotation, no vibration and abnormal sound, observe the motor running current and line voltage before and after the start of any significant fluctuations. Pay attention to the first installation or maintenance after the operation of the submersible pump, test machine can only start on the ground in order to observe, if found submersible pump abnormalities, should immediately stop, check the direction of rotation is correct, the installation is appropriate, find the reasons after troubleshooting run.

Lifting should pay attention to protect the cable to prevent damage, the lifting device (such as tripod, hoist or electric hoist, etc.) should be greater than the weight of the submersible pump, and leave enough room. Before the hanging of the artificial rotation of the impeller to check whether the rotation is flexible, the main contactor contact contact is good, cable and cable joints with or without rupture, abrasion marks, motor shell grounding is reliable, and check the three-phase circuit with a multimeter line conduction

For more info contact submersible pump suppliers in uae or call us at +971 4 252 2966.

0 Comments

Author

Write something about yourself. No need to be fancy, just an overview.

CategoriesSelf test The Quality of Sewage pumpWhen use deep well submersible pump?Feature of submersible sewage pumpSubmersible sewage pump can withstand high temperatureSubmersible pump inspection after installationWhat situation should stop using submersible pump immediatelyHow to maintain self priming submersible pumpsubmersible pump advantage and disadvantageWhat is submersible pumpAll you need to know about sewage pumping station​

Call Us